THE BOARD OF TRUSTEES FOR THE VILLAGE OF HANLEY HILLS INVITE YOU TO A
SPECIAL MEETING OF THE BOARD, DECEMBER 20, 2022 AT 6:30 PM .
PURPOSE: OPENING OF THE MALLARD STREET REPAIR BIDS
IN PERSON: 7713 Utica Drive, Hanley Hills , MO
BY ZOOM:
MEETING ID: 8984539890
PASSWORD: e61UWQ

INVITATION TO BID – VILLAGE OF HANLEY HILLS, MISSOURI

ASPHALT OVERLAY FOR HANLEY HILLS

The Village of Hanley Hills, Missouri seeks bids from qualified contractors for an asphalt overlay for Hanley Hills (the “Project”) in the Village of Hanley Hills, Missouri.

Sealed bids must be addressed to the City Clerk’s Office,7713 Utica Drive, Hanley Hills, Missouri, 63133 and will be accepted until 4:30 p.m. December 13, 2022.

ASPHALT OVERLAY FOR HANLEY HILLS

The award of the bid is contingent upon approval from the Board of Hanley Hills.

The bid documents are available at no charge at the Villagof Hanley Hills City Hall, 7713 Utica Drive, Hanley Hills, Missouri 63133 or on Hanley Hills’ website.

The Village of Hanley Hills reserves the right to accept or reject any and all bids and or combinations, thereof and to waive any minor irregularities or informalities in the process and accept the bid deemed to be in the best interest of the Village of Hanley Hills and approved by the Board of the Village of Hanley Hills.

All bidders are required to provide a 5% bond in the form of a cashier’s check, or surety bond, acceptable to the Village of Hanley Hills and must show proof of insurance with Hanley Hills as an additional insured. Hanley Hills will need a performance/payment bond for the project.

A pre-construction meeting will be scheduled after a bid is selected. Attendance is mandatory.

The bidder agrees that this bid shall be good and may not be withdrawn of a hundred sixty calendar days after the scheduled closing time of receiving bids.

This activity is expected to be completed no later than 120 days after Board of Hanley Hills approves the bid. If an extension is required, the contractor must make written notice to City Hall with explanations and a revised timeline.

HANLEY HILLS VILLAGE OF SCOPE OF SERVICES – VILLAGE OF HANLEY HILLS OVERLAY PROJECT

The purpose of this bid is to do an asphalt overlay for the designated street in Hanley Hills,
Missouri. The project location is

 Mallard Drive beginning at 7708 Mallard eastward

Note #1: The street has three sinkholes. The bid must include the price of repairing the sinkholes.

Note #2: Work should commence by March 6, 2023 or as weather permits

The work shall be crowned at intersecting streets causing water to flow to existing MSD inlets.

All material and debris resulting from the street project will become the property of the contractor and shall be removed promptly from the site and legally disposed outside the Village limits.

All materials shall meet St. Louis County Department of Highways and Traffic specifications. Any variation from these specifications must be obtained by the contractor and sent to Hanley Hills’ City Hall in writing before placement on the project.

A minimum of three days prior to work commencing, the Contractor shall provide written notification of the asphalt project to all residents that will be affected by the work. The notifications shall be a form letter and copies of all letters shall be submitted to the Village of
Hanley Hills. The Village of Hanley Hills will provide the contractor with a list of all residents, including addresses, to which the Contractor shall send or deliver letters.

The contractor and/or material supplier shall provide a copy of all asphalt designs to be used on the project to the Village of Hanley Hills’ representative for review and approval a minimum of
48 hours prior to commencing any work.

Contractor shall determine the location of all public utilities. If a public utility is damaged the Contractor shall notify the owner. Any damage to public utilities shall be repaired or replaced at the sole expense of the Contractor to the satisfaction of the owner.

The Contractor shall be responsible for any damage to adjacent streets, driveway approaches, sidewalk, resident yards, and curb due to insufficient installation procedures. The Village of
Hanley Hills’ representative reserves the right to require removal of any damaged work.

Contractor shall provide a uniform batch of asphalt, consistent with the initial batch.

Through traffic must be maintained at all times. The contractor shall not be permitted to remove an entire cross-section of pavement at one time, unless otherwise authorized by Hanley Hills’
representative. The Contractor will incur all costs related to the placement, removal, disposal, if cross section streets are damaged.
Restoration will consist of completely backfilling all disturbed areas. Prior to restoration, all forming materials, and construction debris shall be removed from the area.

Any and all settled areas and/or areas that do not have a consistent vegetative cover established will be required to be graded and seeded with straw or with sod before the Village of Hanley Hills will accept the work.

The Contractor shall schedule work to minimize hazards and delay; and shall make every effort possible to promote safety. Adequate means shall be provided to protect the surface from
damage by traffic until such time as the asphalt is set. Detouring traffic for this work will be permitted. The reference standard for signage shall be the Manual of Uniform Traffic Control Devices.

Notice of start of work, any street closure, shall be the responsibility of the Contractor prior to the commencement of the work on the street. Notice shall be made by handouts to each home
with dates, times, and type of work being performed. Handouts will contain a contact person and number for the general contractor. The contractor shall be allowed to shut down no more than
one side of the street at a time. The contractor shall notify affected residents, at least 48 hours in advance, of any interruptions. Streets should be posted for no parking at least 48 hours prior to
commencement of work.

Damage to incurred surfaces is the responsibility of the contractor. If damage occurs where
suitable means have been made to protect the uncured surface, violators will be prosecuted, and
the contractor shall be reimbursed for the amount of the damages



BID FORM – VILLAGE OF HANLEY HILLS, MISSOURIAPSHALT OVERLAY

The following proposal is hereby provided to the Village of Hanley Hills by ________________
Hereinafter called “BIDDER”.

The Bidder, in compliance with the invitation to bid, and all supporting documentation, for the Village of Hanley Hills’ project, Asphalt Overlay for Hanley Hills, having examined the plans,
specifications and related documents and being familiar with all of the conditions surrounding the proposed project including the availability of materials and labor, hereby proposes to furnish
all equipment, tools, labor, materials, supplies, and whatever else is needed to complete the project in accordance with the plans and specifications, within the time set forth therein, and the
prices stated on the bid form.

Additional spaces have been provided for items which the Bidder determines needed to be separated from the items listed. Regardless of whether or not separate items are listed, the
Bidder is still obligated to complete the entire project according to the plans, specifications and related documents, and will also meet or exceed in the general industry standards in the construction industry for the work completed.
The total price shall include all equipment, labor, materials, supplies and whatever else is needed to complete the item.

Contractors must conduct a site visit to examine Mallard Drive, determine its measurements and what work may need to be done prior to starting the asphalt overlay and include proof of
such visit with the bid. If after work is started on the overlay project, contractor discovers workthat must be done prior to commencing the project, it shall be the responsibility of the contractor
to pay those costs.

Description Unit Price
Price of repairing sinkholes $_______________________
Fill all potholes to grade level: $________________________
Use Commercial “C” Bituminous Asphalt $_________________________
3” Overlay of pavement resurfacing: $__________________________
Use Standard Traffic Control Devises: $__________________________
Total Bid: $__________________________



The unit prices shall include all labor, materials, incidentals, etc. The above quantities could be
increased or decreased and the contractor will be paid on actual quantities

CONTRACTOR
Signed ________________________ ATTEST: __________________
Name: _________________________ Name: ______________________
Title: ___________________________ Title: _________________________
Date: ____________________________ Date: _________________________

Company Name: ______________________________________________________________
Address: ______________________________ City: ___________________
State: _____________________ Zip Code: _______________
Cell: ___________________ Office Phone: ____________


To Whom It May Concern

The undersigned, having familiarized themselves with the existing conditions of the project affecting the cost of work, and with Contract documents, hereby proposes to furnish all
supervision, technical personnel, labor materials, machinery, tools, appurtenances, equipment and services, including utility, transportation services (including all incidentals) required to
perform the street repair in connection with the work within the Village of Hanley Hills.

In submitting this bid, the bidder understands that the right is reserved by the Village of Hanley Hills to reject any and all bids. Basis of award will be the total base bid of the lowest, responsible and responsive qualified bidder. If written notice of acceptance of this bid is mailed
or delivered to the undersigned within 30 days after the opening thereof, or any time thereafter before the bid is withdrawn, the undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bonds and insurance certificates within 10 days after the Agreement is presented to him or her for signature.

Security in the sum __________________________________________ dollars
($ _________________________) in the form of ______________________ is submitted
herewith in accordance with the Invitation for Bids.

The bidder is prepared to submit a financial and experience statement upon request.

The total bid price should include the costs for removal of the existing pavement, replacement of the pavement and any other work associated with the project and with any permit cost from the
Village of Hanley Hills and/or St. Louis County. The contractor will comply with all the local, state and county regulations governing the project.

Total Bid Price __________________________________ Dollars and ______________ cents
($ ____________ )

Authorized Officer Signature: _____________________
Date: _________________